Work Breakdown Structures Details

  • The best price of Work Breakdown Structures by Jumia in Egypt is 1,600 EGP
  • Available payment methods are
    Cash on DeliveryCredit CardE-Payment
  • Delivery fees are 15 EGP, with delivery expected within 2-5 day(s)
  • Similar products to Work Breakdown Structures are sold at Jumia with prices starting at 3,078 EGP
  • The first appearance of this product was on Jun 23, 2022
  • Amongst similar products of Work Breakdown Structures the cheapest price is 320 EGP from Jumia

Technical Specifications

SKU:JU678BM0H7MJ2NAFAMZ
Color:Black
Shop Type:Jumia Mall/Food
Main Material:paper
Production Country:UK
Size (L x W x H cm):17x24

Similar Products

Store

Payment methods

Delivery Time

Delivery Fees

Jumia's Description

The Work Brakdown Structure has emerged as a foundational concept and tool in project Management. It is an enabler thst ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool.

Top Products in Booksmore

    Reviews of Work Breakdown Structures

    • No reviews exist yet for this product.

    Video Reviews of Work Breakdown Structures

    • loading video reviews