This product may not be available anymore.

Construction Project Management : An Integrated Approach Details

  • The best price of Construction Project Management : An Integrated Approach by Jumia in Egypt is 661 EGP
  • Available payment methods are
    Cash on DeliveryCredit CardE-Payment
  • Delivery fees are 15 EGP, with delivery expected within 2-5 day(s)
  • Similar products to Construction Project Management : An Integrated Approach are sold at Jumia with prices starting at 2,160 EGP
  • The first appearance of this product was on Sep 22, 2017

Technical Specifications

SKU:JU030BK1F3PV0NAFAMZ
Color:n/a
Model:9780415613453
Author:Fewings
Main Material:n/a

Similar Products

Store

Payment methods

Delivery Time

Delivery Fees

Jumia's Description

The role of the project manager continues to evolve, presenting new challenges to established practitioners and those entering the field for the first time. This second edition of Peter Fewings' groundbreaking textbook has been thoroughly revised to recognise the increasing importance of sustainability and lean construction in the construction industry. It also tackles the significance of design management, changing health and safety regulation, leadership and quality for continuous improvement of the service and the product. Using an integrated project management approach, emphasis is placed on the importance of effectively handling external factors in order to best achieve an on-schedule, on-budget result, as well as good negotiation with clients and skilled team leadership. Its holistic approach provides readers with a thorough guide in how to increase efficiency and communication at all stages while reducing costs, time and risk. Short case studies are used throughout the book to illustrate different tools and techniques.Combini...

Construction Project Management : An Integrated Approach Price insights and history

  • The cheapest price of Construction Project Management : An Integrated Approach in Egypt was 492 EGP from Jumia within the past 77 months
  • The highest price of Construction Project Management : An Integrated Approach in Egypt was 661 EGP from Jumia within the past 77 months
  • The price difference between the cheapest and highest price of Construction Project Management : An Integrated Approach in Egypt is 169 EGP from Jumia within the past 77 months
  • The average price of Construction Project Management : An Integrated Approach in Egypt is 561.75 EGP from Jumia within the past 77 months

Top Products in Booksmore

    Reviews of Construction Project Management : An Integrated Approach

    • No reviews exist yet for this product.

    Video Reviews of Construction Project Management : An Integrated Approach

    • loading video reviews